New balloon loop 2008

In 2008 the operational flexibility of the high level circuit was further improved with the provision of a balloon loop to the east of the steam up bay, giving the opportunity to reverse trains and dispatch them back down the branch to the lower circuit.

This entry was posted in Construction Photos, Gallery and tagged , , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>